This hybrid energy storage (ESS) system made of advanced lead and lithium batteries is currently the largest of its kind in Poland.
Strategically situated to enhance the Bystra Wind Farm in Northern Poland, this facility maximizes renewable energy usage and stabilize local energy supplies.
Through efficient energy time-shifting, the system provides a reliable power source during peak demand periods, lowering energy costs for industries and residents. It focuses on low-carbon technologies and high recycling rates, setting a new standard for energy solutions in the region.
Location | Gdańsk County, Pomeranian Voivodeship, Poland |
Project launch | October 2019 |
Construction time | 12 months |
Size of the system | advanced lead batteries: 26.9 MWh energy; 5 MW power | lithium batteries: 0.47 MWh energy; 1 MW power; 4.5-hour system |
Battery type | 2 V advanced lead-carbon AGM batteries** and lithium batteries |
Battery provider | Showa Denko Materials |